The installation sequence we follow
Each stage is signed off before the next begins, so a dimensional problem is caught while it is still cheap to correct.
- Site survey and civil readiness check of shaft, pit and overhead
- Template setting, guide rail plumbing and bracket fixing
- Machine, controller, ropes and counterweight erection
- Landing and cabin door installation and adjustment
- Wiring, commissioning, load and safety testing
- Operational briefing and handover documentation